您当前的位置 :English > Life > Transportation 正文
Track-laying construction of the high-speed rail traveling from the north of Xinmin to Tongliao has been completed
It takes only 1.5 hours to travel from Shenyang to Tongliao
    稿源: Shenyang Daily   2018-05-23 11:24
 

May 22, reporter learned from railway department that along with the laying of the last 500m steel rail, the track-laying construction of the first high-speed rail which connects Inner Mongolia Autonomous Region and the NE China region---the high-speed rail traveling from the north of Xinmin, Liaoning Province, to Tongliao, Inner Mongolia Autonomous Region has been completed. It "joined hands" with Beijing-Shenyang High-speed Rail officially which is under construction in Shenyang now and laid a solid foundation for the operation of whole railway line.

This high-speed rail travels from the north railway station of Xinmin and runs to Zhangwu of Liaoning Province, Ganqika Town of Inner Mongolia Autonomous Region, and ends at Tongliao railway station. The total length is 197km with a design speed of 250km/h. Track-laying construction of Xinmin-Tongliao high-speed rail started from January 7, 2018. 500m steel rail is used to make continuously welded rail track.Two most advanced CPG500 track laying machines of our country which owns proprietary intellectual property rights are used in this construction. China Railway 14th Bureau Group, the construction unit, used large-scale maintenance machinery to work for the tight alignment of the railway and ensured the fine construction quality.

It's learned that the construction of Xinmin--Tongliao high-speed rail started in June, 2016. It's one of the components of high-speed rail network, the medium and long-term railway network planning of China. It connects with Bingjing-Shenyang High-speed Rail under construction now in Shenyang and integrates into the national high-speed rail network. After the construction, the traveling time of the trains from Tongliao to Shenyang will be reduced from 5 hours to 1.5 hours. The traveling time of the trains from Tongliao to Beijing will be reduced from 14 hours to about 3.5 hours.

Reporter Di Xueying

 
编辑: zfw05