您当前的位置 :English > Life > Transportation 正文
Feixiang Road of Tiexi District to be half closed for construction
source: Shenyang Evening News  2018-06-03 11:21

May 31, Shenyang Municipal Public Security Bureau Traffic Police Detachment announced that in accordance with the unified arrangement the drainage and water logging engineering at Feixiang Road of Tiexi District will be carried out at 21:00, June 1st, with a construction duration of 30 days.The construction starts from Tengfei 2nd Street on the west to Lingkong 1st Street on the east with a total length of 1200m.The construction will occupy the two motor vehicle lanes on the north of the road. The two motor vehicle lanes left on the south will be used for 2-way traffic.

Reporter Yang Shuo

Editor: zfw05